Your Position: Home > Products > Fruit & Vegetable Machine >

Fruit & Vegetable Machine

Red Date Corer Machine|Core Removing Machine|Red Date Kernal Extractor Machine
  • MOQ: 1 set/Sets
  • Brand:GELGOOG
  • Certification:CE
  • Supply Ability: 50 sets per monthSet/Sets Per Month
  • PAY METHOD:WEST UNION L/C T/T CASH
  • Warranty Time:6 Months
  • LOADING PORT:Qingdao Port/Tianjin Port
  • Country Of Origin:China
  • Features
  • Technical Data
  • FAQ
  • Case
  • Certification
Red Date Kernal Extractor Machine
This machine is specially used to process red dates,palm date,iraq dates,taiwan date etc.Finished date can be used for candied date,sweetmeat etc. 
It's easy to operate.One person can control 3-4 sets of machine.

Main specification:
The red jujube nuclear machine, special dates, red jujube to nuclear nuclear machine this machine is specially designed for jujube to nuclear work, also applies to Iraq jujube go nuclear, dates, Taiwan jujube, it can be processed per hour dates, Iraq jujube, 150-200 kg, go nuclear rate was 96%, the remnant rate of less than or equal to 5%.
Contact with dates to nuclear machine parts adopt stainless steel material.Choose the 220 v power system, 1.5 KW motor, convenient and simple operation and maintenance is a highlight of the machine, even if this is your first contact with it, to use handy!
Nuclear machine, easy to use, don't have to watch for a long time, one person can management 3-4 machine at the same time, and easy maintenance, strong and durable.Small volume, the machine covers an area of 1.2 square meters.

Model Extracting Rate Power Specification of Date Capacity
GGZQH-31 95-98% 1.5kw,380v ∮12-∮20 187200 pcs/h
GGZQH-32 95-98% 1.5kw,380v ∮20-∮24 100800 pcs/h
GGZQH-33 95-98% 1.5kw,380v ∮24-∮26 79200 pcs/h
GGZQH-34 95-98% 1.5kw,380v ∮26-∮30 57600 pcs/h

1.Ask:Which kind of date the machine can process?
 Answer:Our machine is suitable to remove several kinds of date,such as red dates,palm date, Iraq dates,taiwan date,Jujube,chinese date etc.
 
2.Ask:What is the material of the machine?
  Answer:Our machines have half stainless steel and full stainless steel,you can choose what you need.
 
3.Ask:Is the machine have the function of cutting the date into half?
  Answer:Yes,if you need we can install a blade for cutting,of course,you can also remove the blade.It all depends what you need.
 
4.Ask:When you delivery the machine?
 Answer:15-20 days after received 40% of the whole payment.If you need,we can arrange time for you.

Brand:DATE JONINT PROCESSING CO.,Ltd                       
Country:Pakistan 

Follow us